Guest cirej2000 Report post Posted April 30, 2010 One thing I would like to be able to do when ramping up users is to also have a delay between each ramp up group. Basically, all it would do is add an additional parameter to the "Ramp-up Load" option on the "Test Volume" module. The additional parameter would be a "Delay Between Steps" option that would allow for you to let a batch run for a period of time in full before ramping-up again. Quote Share this post Link to post Share on other sites